Friday, January 16, 2009

Renovation Progress

Assalamualaikum,

The front wakaf is nearing completion- 90%. Hopefully, this wakaf not only will be used for the students to study, but also a resting area and a reception area for visitors- InsyaLLAH. A toilet is built next to it for the use of our visitors to avoid disturbance during lessons and uneasy feelings for our muslimah in the house.
Alhamdullilah, this wakaf is from the money donated by muslims. May ALLAH reward them.
.


The back wakaf is 80 % completed. a worker is cutting the trusses and those planks/woods that cannot be used have been demolished for the students’ safety and convenience.





This picture here is the back wakaf. The floor is completed but the fence is yet to be done.
The porch was converted into an office. This is for better administration and management and as of now, everything is piled up in bags and placed near the walls. “out of bound” area is also placed for safety and secrecy reasons. Hopefully later all those documents can be stored properluy into this new office insyaALLAH.


Side view of our office. From here you can see the entrance and another entrance next to the gate.

The kitchen is still under construction. Sadly, in this visit ( near Magrib time), everything was quite dark because there were no lights and no pictures to show you this time.



AN insert- a neigbour from across the road ( The Orpange JASA)
During our opening ceremony, they came to celebrate with us. The kids wearing maroon attire (in our earlier post) were these orphans.(Click here)
Eight (8) of them are currently our students and they come for our night classes. Hopefully , these two organizations will gather support from muslims all over the world.
We pray to all Muslims in Palestine, Afghanistan, Kashmir, Pattani and where ever you may be will be given the strength from ALLAH to overcome our enemies. Victory for Islam!

0 comments: